01
Moisture control
Low-moisture technique throughout, with volume controlled around seals, drains, bays, antennas and any bonded joint.

Standards & safety
Aircraft-safe method, a clearly bounded scope, disciplined coordination and documented handback — on every visit, on every airframe.
01Position
Appearance care, clearly bounded
That sentence is the foundation of everything else on this page. Knowing exactly where appearance work ends is what makes us safe to have on your ramp.
Aircraft appearance work sits adjacent to maintenance and is constantly tempted into it. A polished surface reveals a crack. A cabin detail finds a failed seal. A boot dressing exposes lifting. In every one of those cases the correct action is the same: stop, document, report, and refer it to the operator's approved maintenance provider.
We do not perform, advise on, or make representations about maintenance, airworthiness or aircraft condition. We do appearance work, we do it to a high standard, and we tell you exactly what we saw while we were doing it.
See how a visit runs02Aircraft safety
Most damage caused during appearance work is caused by method, not by malice. These are the specific things we control for.
01
Low-moisture technique throughout, with volume controlled around seals, drains, bays, antennas and any bonded joint.
02
Probes, static ports, vanes, vents and drain masts identified and protected before any contact, then logged off and accounted for at handback.
03
Products chosen for compatibility with certified paint systems, composites, acrylic, elastomers and cabin materials — not for cutting speed.
04
Correction staged from least aggressive, assessed between stages, and stopped well inside the limits of the paint film or the polished metal.
05
Adjacent surfaces, placards, decals, seals and de-ice boots masked before compounds, machines or chemistry come near them.
06
Tools, media, covers and consumables controlled and counted. Nothing is left on, in or under an aircraft we have worked on.
Discretion
Owners, flight departments and brokers all need the same thing from a vendor with ramp access: someone who does not talk about the work, the aircraft or the client.
Quality control
Quality control is only meaningful if there is a written scope to check against. That is why the scope is written first, every time.
03How a visit runs
The sequence does not change with the size of the job. Select any step to see what happens and what we need from you.
Step 01 / 06
You send the aircraft, the airport and the window. Nothing else is needed to start.
Step 02 / 06
We review condition, agree what is realistic in the time available, and write the scope down.
Step 03 / 06
We deal with the FBO, hangar tenant or flight department so your crew does not have to.
Step 04 / 06
Specialist crews work the agreed scope with aircraft-appropriate methods and products.
Step 05 / 06
A structured walkaround against the written scope before anyone calls the work finished.
Step 06 / 06
The aircraft is returned to the line with a completion record and anything we noticed along the way.
Claims policy
You will not find invented statistics, unverifiable guarantees, borrowed testimonials or certification claims on this site. If it is not on here, it is because we have not yet documented it — not because it is hidden.
04Questions
Insurance requirements vary by facility and by operator, and the specifics are shared directly with the party engaging us. Ask at scoping and you will get documentation rather than a claim on a web page.
It is reported to you immediately, documented, and handled through the proper process. A vendor who has never had an incident is a vendor who has not worked many aircraft — what matters is how it is handled when it happens.
Yes. Confidentiality is our default regardless, but where an owner, flight department or broker needs it formalised we are glad to sign.
Immediately, and it is one of the more useful things we do. We would much rather refer a job to your maintenance provider than take it on and put you in a difficult position.
Next step
Scope boundaries, insurance, confidentiality, method — all of it is easier to settle before a crew is on your ramp than after.
Ramp dispatch
Your reference is received. The PAC operations team will review the aircraft, location and service window before confirming scope.